Running a Grid at 95% Renewables: What Ireland's Market Reform Teaches Every TSO
19. 11. 2026 | Reading time: 3 min.
Four reform streams that move together
The reform is not a single project but a set of closely linked streams. Recent updates to system operators, the regulator and market participants focused on progress in each of them:
- System services (FASS). The Future Arrangements for System Services move the procurement of system services from regulated tariffs to competitive auctions, starting with a daily Day-Ahead System Services Auction for reserve services.
- Strategic Markets Programme. It prepares the systems and processes for integrating the SEM with EU electricity markets, including day-ahead and intraday trading and cross-border capacity calculation.
- Celtic Interconnector. A 700 MW HVDC link to France will be the first direct connection between Ireland and continental Europe, bringing the SEM into the Core capacity calculation region.
- Balancing and flexibility. Regional dimensioning and procurement of balancing reserves are back on the agenda.
The streams depend closely on each other: a delay in one is felt in the others.
What this means for Transmission System Operators
System services become a complex market process. The process covers registration and qualification of market participants, tenders, and final evaluation and settlement. Each step needs rules that all parties define, document and approve. This takes time, and in Ireland the implementation dates for the new system services rules have recently been pushed back.
Capacity calculation goes regional. Joining the Core region means calculating transfer capacities, validating flows for outages, topology variants and renewable forecasts, and sending the results to central European platforms. Systems must also support regional dimensioning and procurement of balancing energy.
For IT, the lesson is clear: the systems behind these processes must cope with rules and deadlines that keep moving.
Where Damas MMS fits
A blueprint for others
Ireland shows that a grid with up to 95% non-synchronous generation is as much a market design and IT challenge as an engineering one. System services, regional capacity calculation and balancing must progress together, and timelines shift as the rules mature.
Transmission System Operators on the same path will need market systems that can adapt as regulation and timelines change.